Ain Tsila Development Pipeline Project
Civil, Mechanical, Electrical, and Instrumentation works for the installation of 12"-14”-34” pipelines (80 KM each) with associated black valves and tie-in works.
Civil, Mechanical, Electrical, and Instrumentation works for the installation of 12"-14”-34” pipelines (80 KM each) with associated black valves and tie-in works.